Work on intercity railway linking Beijing and Xiongan New Area begins
The line begins from Liying Railway Station in Beijing, passing through the capital's new airport in Daxing district and Hebei's Bazhou, and terminates at Xiongan Railway Station.
With an investment of 33.53 billion yuan, the railway has an overall length of 92.4 kilometers, with five stations along the line.
It will allow high-speed trains to run with a design speed of 350 kilometers per hour in the section from the new airport to Xiongan when it is put in use in 2020.
The section between Liying and the new airport will be put into use in September 2019 when the new airport is expected to open to traffic, with a design speed of 250 km/h.
After the new railway line comes into service, the travel time from Xiongan New Area to Beijing will be 30 minutes.
- Shanxi ends province-wide blanket fireworks ban
- Audit: China fixes bulk of fiscal problems tied to 2024 budget
- China reports major gains in circular economy
- Chinese lawmakers review draft revision to banking supervision and regulation law
- Top legislature to study draft laws on environment, ethnic unity, national development planning
- Administrative organs must secure people's interests: senior judge
































